Patio progress

As you can see in these photos we’re making headway on the patio project. 

Patio2
We moved the window from the pool house to the patio area.  The outside siding is almost done.

Farmer Murp
Farmer Murphy planting some trees and plants.

Patio4
Don Schoendienst does some wiring in the ceiling.  We have the majority of the electrical wiring done.  Now we need to do the speaker wiring and hook up all the fixtures.

Patio5
Dave Heacock spreads adhesive for the bar top that was installed.  Gerard is going to wrap the bar top in stainless steel this week (hopefully).

Kids1

Wrigley and the Porzelt kids and friends cavort on the new sidewalk.